Monday, September 14, 2009

Re: Shutdown stsetch2 SNF 2009-09-13 19:16:35: backside gas leak

Replaced the backside He cooling oring (lip seal) and cleaned the platten. Ran an O2 plasma for about 30 min. He leak rate was 20 mT/min.

No comments: