Sunday, April 5, 2009

Shutdown stsetch2 SNF 2009-04-05 22:11:32: Transfer Operation err

When the system was trying open the transfer gate to load the wafer into the chamber, a large hasssing noise can be heard. Red alarmed read "the transfer handler (LLC3) reports it took too long to change the position of the chamber tranfer gate. "

No comments: